Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/76350
Title: Schedule risk modeling in prefabrication housing production
Authors: Li, CZ 
Shen, GQ 
Xu, XX
Xue, F 
Sommer, L
Luo, LZ 
Keywords: Schedule risk management
Prefabrication housing production
System dynamcis
Hong Kong
Issue Date: 2017
Publisher: Elsevier
Source: Journal of cleaner production, 2017, v. 153, no. 1, p. 692-706 How to cite?
Journal: Journal of cleaner production 
Abstract: Every country is dealing with its own housing problems; however, none compares with Hong Kong where housing has always been a major concern as a result of low supply over the past decades. Against the constraints in delivering sufficient houses, prefabrication as a sustainable solution for housing has been increasingly advocated for its potential merits of better quality, construction safety and cleaner built environment. However, schedule delay caused by various risks affected the prefabrication housing production (PHP) in Hong Kong. This problem can be further worsened when the manufacturing sector of PHP has entirely moved to offshore areas in the Pearl River Delta region. This study applies system dynamics to recognize and investigate the potential effect of various risks on the scheduling of prefabrication housing construction projects through the employment of Vensim software package. The simulation results show that schedule risks, namely low information interoperability between different enterprise resource planning systems (LIIBDERPS), logistics information inconsistency due to human errors probability (LIIHEP), Delay of delivery of precast element to site (DDPES), and Design information gap between designer and manufacturer (DIGDM) significantly contribute to the schedule delay in PHP. However, schedule is more sensitive toward LIIBDERPS than for the other three risks, indicating that LIIBDERPS should be monitored and given priority. The system dynamic model serves as an effective tool for quantitatively evaluating the effect of various risks on the schedule of PHP, offering valuable references for managers though comparing simulation results under different risk scenarios, so that potential risks that might lead to schedule delay could be identified and handled in advance.
URI: http://hdl.handle.net/10397/76350
ISSN: 0959-6526
EISSN: 1879-1786
DOI: 10.1016/j.jclepro.2016.11.028
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

6
Citations as of Dec 13, 2018

WEB OF SCIENCETM
Citations

5
Last Week
0
Last month
Citations as of Dec 13, 2018

Page view(s)

48
Last Week
4
Last month
Citations as of Dec 16, 2018

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.