Title: Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates
Authors: Kong, LL 
Li, H 
Luo, HB
Ding, LY
Luo, XC 
Skitmore, M
Keywords: Precast construction
Just-In-Time (JIT) assembly
Single machine batch scheduling
Changeover cost
Issue Date: 2017
Publisher: Elsevier
Source: Automation in construction, 2017, v. 81, p. 34-43 How to cite?
Journal: Automation in construction 
Abstract: The manufacture, transportation and on-site assembly sectors of precast construction projects are often considered separately and managed by rule of thumb, causing an inefficient use of resources and postponed delivery. This study views these sectors as a whole from the perspective of a single machine batch-scheduling problem. A dynamic programming algorithm, which aims to search for solutions that entail maximum production efficiency, was developed accordingly with the constraints of changeover costs and production deadlines. We tested the method's ability by processing as many products as possible simultaneously using real data collected from a precast factory in a simulation and compared the effect with a previous study. We found that our method, possesses great potential to improve the efficiency of precast production.
URI: http://hdl.handle.net/10397/75998
ISSN: 0926-5805
EISSN: 1872-7891
DOI: 10.1016/j.autcon.2017.03.016
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

1
Citations as of May 12, 2018

WEB OF SCIENCETM
Citations

1
Last Week
0
Last month
Citations as of May 20, 2018

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.