Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/74662
Title: Origins and probabilities of MEP and structural design clashes within a federated BIM model
Authors: Pärn, EA
Edwards, DJ
Sing, MCP 
Keywords: Building information modelling
Clash detection
Cumulative distribution function
Generalized Gamma distribution
Log Logistic (3P) distribution
Probability density function
Issue Date: 2018
Publisher: Elsevier
Source: Automation in construction, 2018, v. 85, p. 209-219 How to cite?
Journal: Automation in construction 
Abstract: ‘Design clashes’ encountered during the development of a large multi-storey educational building, awarded under a Joint Contracts Tribunal (JCT) Design and Build contract, are reported upon. The building was developed in Birmingham, UK and the contract value was circa £36 million (UK Sterling, 2015). Members of the project management team (PMT) produced designs that were subsequently integrated by the main contractor into a federated building information modelling (BIM) modelMergeCell at this stage 404 error clashes were evident between the positions of the mechanical, electrical and plumbing (MEP) designer's and structural designer's building compartments. The contractor deemed that these particular clashes were ‘mission critical’ as previous experience suggested that project costs could spiral uncontrollably if left unabated. Participatory action research was employed to acquire a deeper understanding and knowledge of the clash incidents. Clash data accrued (in mm) was subsequently quantitatively modelled using the probability density function (PDF) and the cumulative distribution function (CDF). Two models produced were the Log Logistic Three Parameter (3P) (using all data including outliers) and Generalized Gamma distribution (excluding outliers). Both models satisfied Anderson-Darling and Kolmogorov-Smirnov goodness of fit tests at α 0.01 and 0.02 levels of significance. Model parameters could be used to forecast similar clashes occurring on future projects and will prove invaluable to PMT members when accurately estimating the time and resource needed to integrate BIM designs. The predictive modelling revealed that 92.98% of clashes reside within the 30–299 mm range while the most probable occurrence of a clash overlap resides in a discrete category of 100–199 mm. Further qualitative investigation is also conducted to understand why these clashes occurred and propagate ideas about how such may be mitigated. The research concludes on two important points, namely: i) BIM is not a panacea to design related construction project rework and that innovative 21st century digital technologies are hampered by 20th century management practicesMergeCell and ii) improvements in clash and error mitigation reside in a better understanding of tolerances specified to alleviate the erroneous task of resolving unnecessary clashes. Future research is proposed that seeks to: automate the clash detection management, analysis and resolution processMergeCell conduct further investigative analysis of the organizational and human resource management influences impacting upon design clash propagationMergeCell and devise and validate new procedural methods to mitigate clash occurrence using a real-life project.
URI: http://hdl.handle.net/10397/74662
ISSN: 0926-5805
EISSN: 1872-7891
DOI: 10.1016/j.autcon.2017.09.010
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

5
Last Week
0
Last month
Citations as of Feb 20, 2019

Page view(s)

32
Last Week
1
Last month
Citations as of Feb 17, 2019

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.