Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/7218
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Land Surveying and Geo-Informatics-
dc.contributorDepartment of Civil and Environmental Engineering-
dc.creatorYin, JH-
dc.creatorDing, XL-
dc.creatorYang, Y-
dc.creatorLiu, Z-
dc.creatorHuang, D-
dc.creatorChen, YQ-
dc.date.accessioned2015-11-10T08:32:42Z-
dc.date.available2015-11-10T08:32:42Z-
dc.identifier.issn1000-6915-
dc.identifier.urihttp://hdl.handle.net/10397/7218-
dc.language.isozhen_US
dc.publisher岩石力學與工程學報編輯部en_US
dc.rights© 2004 中国学术期刊电子杂志出版社。本内容的使用仅限于教育、科研之目的。en_US
dc.rights© 2004 China Academic Journal Electronic Publishing House. It is to be used strictly for educational and research use.en_US
dc.subjectSlopeen_US
dc.subjectAutomaticen_US
dc.subjectSlope monitoring systemen_US
dc.subjectMulti-antenna GPSen_US
dc.subjectDatabaseen_US
dc.title常规仪器与全球定位仪相结合的全自动化遥控边坡监测系统en_US
dc.typeJournal/Magazine Articleen_US
dc.description.otherinformationAuthor name used in this publication: 殷建华en_US
dc.description.otherinformationAuthor name used in this publication: 丁晓利, DING Xiao-lien_US
dc.description.otherinformationAuthor name used in this publication: 杨育文en_US
dc.description.otherinformationAuthor name used in this publication: 刘志强en_US
dc.description.otherinformationAuthor name used in this publication: 黄丁发en_US
dc.description.otherinformationAuthor name used in this publication: 陈永奇, Chen Yongqien_US
dc.description.otherinformationTitle in Traditional Chinese: 常規儀器與全球定位儀相結合的全自動化遙控邊坡監測系統en_US
dc.description.otherinformationJournal title in Traditional Chinese: 巖石力學與工程學報en_US
dc.identifier.spage357-
dc.identifier.epage364-
dc.identifier.volume23-
dc.identifier.issue3-
dcterms.abstract介绍了一集常規仪器与精密全球定位仪器为一体的全自动化遥控边坡监测系统的开发与应用。 集成的自动化边坡监测系统包括仪器选择、技术要求、仪器集成方法、监测数据处理等。最后,还介绍该系统对一松散填土边坡的监测结果。-
dcterms.abstractThis paper introduces the development and application of an integrated automatic slope monitoring system. The system combines (a) advanced conventional instruments and (b) accurate global positioning instruments. The development includes selection of all instruments,technical requirements,integration method and post-process of monitoring data,etc. This system has been installed in a real loose fill slope to verify its functions and reliability of the integrated system including remote data acquisition. Preliminary monitoring data are presented and discussed in this paper.-
dcterms.accessRightsopen accessen_US
dcterms.alternativeIntegration of conventional instruments and GPS for remote automatic monitoring of slopes-
dcterms.bibliographicCitation岩石力学与工程学报 (Chinese journal of rock mechanics and engineering), Feb. 2004, v. 23, no. 3, p. 357-364-
dcterms.isPartOf岩石力学与工程学报 (Chinese journal of rock mechanics and engineering)-
dcterms.issued2004-
dc.identifier.scopus2-s2.0-2442659466-
dc.identifier.rosgroupidr16947-
dc.description.ros2003-2004 > Academic research: refereed > Publication in refereed journal-
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
Yin_Integration_Conventional_Instruments.pdf488.88 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

345
Last Week
1
Last month
Citations as of Apr 14, 2024

Downloads

246
Citations as of Apr 14, 2024

SCOPUSTM   
Citations

13
Last Week
0
Last month
Citations as of Apr 19, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.