Title: Comparing the performance quality of design-bid-build and design-build delivery methods
Authors: Yu, T
Shen, GQ 
Shi, Q
Issue Date: Apr-2017
Source: Journal of construction engineering and management, Apr. 2017, v. 143, no. 4, 04016111, p. 1-10
Abstract: The choice of delivery method is one of the most important decisions that can determine the quality of construction projects. Two basic delivery methods, design-bid-build and design-build, have been compared in terms of project quality; however, an important quality dimension, performance quality, has generally been ignored in previous studies. In this study, the authors used existing economic theories to develop a model to examine the performance quality and project profits of these two delivery methods. The equilibrium points of the model were analyzed with consideration given to influencing factors such as cost coefficient, cooperation efficiency, and coordination cost. Four propositions were made to facilitate the quality-profit comparisons between design-bid-build and design-build. The first proposition showed that to maximize personal profit, the project coordinator should always keep a balance between design quality and construction quality, regardless of the delivery method. The other three propositions indicated that both methods can generate relatively higher levels of performance quality and project profits in an appropriate project environment. Based on these propositions, the authors ranked the performance quality and profits of the two methods within different conditions and used a real project to exhibit the practical value of these findings. Via case study, cooperation efficiency was identified as the most critical factor that determines the selection of delivery method. In addition, three key steps were summarized to facilitate the application of the model developed in this study.
Keywords: Design-bid-build
Design-build
Economic theories
Performance quality
Project profits
Quality-profit equilibrium points
Contracting
Publisher: American Society of Civil Engineers
Journal: Journal of construction engineering and management 
ISSN: 0733-9364
EISSN: 1943-7862
DOI: 10.1061/(ASCE)CO.1943-7862.0001262
Rights: Copyright 2017 by the American Society of Civil Engineers This is the author’s version of a work that was accepted for publication in Journal of construction engineering and management . The open URL of the article: http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001262
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Yu_Tao_2016_r.pdfPre-published version565.93 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

439
Last Week
0
Last month
Citations as of Apr 14, 2024

Downloads

528
Citations as of Apr 14, 2024

SCOPUSTM   
Citations

19
Last Week
0
Last month
Citations as of Apr 19, 2024

WEB OF SCIENCETM
Citations

14
Last Week
0
Last month
Citations as of Apr 18, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.