Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/61046
Title: Optimal scheduling of virtual power plant with battery degradation cost
Authors: Zhou, B
Liu, X
Cao, Y
Li, C
Chung, CY 
Chan, KW 
Issue Date: 2016
Publisher: Institution of Engineering and Technology
Source: IET generation, transmission & distribution, 2016, v. 10, no. 3, p. 712-725 How to cite?
Journal: IET generation, transmission & distribution 
Abstract: This study proposes a novel optimal generation scheduling model for virtual power plant (VPP) considering the degradation cost of energy storage system (ESS). The VPP is generally formed by a mix of distributed energy resources, and the ESS is an important installation for flexible VPP dispatch due to its controllable and schedulable behaviours. For the operations of battery storage systems, the ambient temperature and depth of discharge have significant impacts on the wear and tear of the ESS as well as battery degradation cost. Furthermore, the battery degradation cost is modelled and approximated by a piecewise linear function, and then incorporated into the proposed optimal VPP scheduling model. Consequently, the optimal VPP scheduling problem is formulated as a two-stage stochastic mixed-integer linear programming in order to maximise the expected profits of the VPP. The proposed model has been successfully implemented and tested through a representative case study, and the influence of battery degradation cost on optimal VPP scheduling has also been thoroughly analysed and demonstrated.
URI: http://hdl.handle.net/10397/61046
ISSN: 1751-8687 (print)
1751-8695 (online)
DOI: 10.1049/iet-gtd.2015.0103
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page view(s)

5
Last Week
0
Last month
Checked on Jun 25, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.