Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/60273
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Electrical Engineering-
dc.creatorWang, L-
dc.creatorWen, FS-
dc.creatorYu, CW-
dc.date.accessioned2016-11-21T02:36:29Z-
dc.date.available2016-11-21T02:36:29Z-
dc.identifier.issn1000-3673-
dc.identifier.urihttp://hdl.handle.net/10397/60273-
dc.language.isozhen_US
dc.publisher中國學術期刊(光盤版)電子雜誌社en_US
dc.rights© 2006 中国学术期刊电子杂志出版社。本内容的使用仅限于教育、科研之目的。en_US
dc.rights© 2006 China Academic Journal Electronic Publishing House. It is to be used strictly for educational and research purposes.en_US
dc.subjectElectricity marketen_US
dc.subjectBidding strategyen_US
dc.subjectAverage probability of winsen_US
dc.subjectPrice-takeren_US
dc.subjectSelf-schedulingen_US
dc.subjectStepwise bidding protocolsen_US
dc.titleImpacts of different numbers of bidding blocks on generation companies’ bidding strategiesen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage31-
dc.identifier.epage35-
dc.identifier.volume30-
dc.identifier.issue19-
dc.identifier.doi10.13335/j.1000-3673.pst.2006.19.006-
dcterms.abstract针对国内外实际运营的电力市场中普遍采用的分段报价规约研究了不同允许报价容量段数对发电公司构造最优报价策略的影响。在研究初期以作为价格接受者的发电公司为研究对象,首先采用概率方法模拟电力市场中的电价并在此基础上采用等概率法建立了模拟发电公司最优报价策略的多段报价模型;然后研究了发电公司风险偏好程度和市场信息不对称对其构造最优报价策略的影响。最后通过算例对所提出的模型和方法进行了说明。-
dcterms.abstractIn view of stepwise bidding protocol that is commonly adopted in practical operated electricity market home and abroad,the impacts of different numbers of bidding blocks on the bidding strategies of generation companies are investigated.As a preliminary research,here,the generation companies,which act as price-taker,are taken as subject investigated.Firstly,the electricity price in the market is simulated by probabilistic methods,on this basis and by use of average probability of wins a multi-block bidding model that simulate optimal bidding strategy of generation company is built.Then,the impacts of both generation company’s risk preference extent and market information asymmetry on the construction of generation company’s optimal bidding strategy are researched.Finally,a numerical example is used to demonstrate the proposed model and method,with special emphasis on the impacts of different numbers of bidding blocks on the optimal bidding strategy of generation companies. 还原-
dcterms.accessRightsopen accessen_US
dcterms.alternative不同允许报价段数对发电公司报价策略的影响-
dcterms.bibliographicCitation電網技術 (Power system technology), Oct. 2006, v. 30, no. 19, p. 31-35-
dcterms.isPartOf電網技術 (Power system technology)-
dcterms.issued2006-
dc.identifier.rosgroupidr30922-
dc.description.ros2006-2007 > Academic research: refereed > Publication in refereed journal-
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
r30922.pdf275.68 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

188
Last Week
0
Last month
Citations as of Apr 14, 2024

Downloads

104
Citations as of Apr 14, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.