Title: A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects
Authors: Ameyaw, EE
Chan, PC 
Owusu-Manu, DG
Coleman, E
Keywords: Ghana
Construction projects
Contract sum
Final account
Cost overruns
Fuzzy synthetic evaluation
Issue Date: 2015
Publisher: Emerald Group Publishing Limited
Source: Journal of facilities management, 2015, v. 13, no. 1, p. 45-69 How to cite?
Journal: Journal of facilities management 
Abstract: Purpose
– The purpose of this paper is to identify and then evaluate perceived risk factors influencing variability between contract sum and final count, and to develop a fuzzy risk assessment model for evaluating the overall impact of established critical risk factors impacting on variability between contract sum and final account in government-funded construction projects. Construction projects are characterised by risk factors that significantly impact on variability between the contract sum and final account.
Design/methodology/approach
– A research approach integrating questionnaire survey, mean scoring ranking and principal component factor analysis (PCFA) methods was adopted to evaluate and classify the critical risk factors. A fuzzy synthetic evaluation method was sequentially applied to compute the overall risk impact (ORI) of eight critical risk factors’ impact on variability between contract sum and final account.
Findings
– Initial results showed that eight critical risk factors have high impact on variations between contract sum and final account, namely (in order): project funding problems, underestimation of quantities, variations by client, change in scope of works, inadequate specification, change in design by client, defects in design and unexpected site (ground) conditions. PCFA produced two factor solutions: “professional-related factors” and “client factors”. The fuzzy model further showed that the ORI is 5.48, indicating that these risk factors have a high impact on variability between contract sum and final account in public construction projects. The client factors have a very high impact (5.59), while the professional-related factors indicated a high impact (5.41) on project cost variability.
Originality/value
– A practical model is proposed to evaluate the key risks associated with cost overruns in public projects. By giving effective and sustained attention to these factors, variability between contract sum and final account, a common situation in Ghana, can be controlled to achieve cost savings in public infrastructure projects.
URI: http://hdl.handle.net/10397/55929
ISSN: 1472-5967
EISSN: 1741-0983
DOI: 10.1108/JFM-11-2013-0055
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

8
Citations as of Oct 16, 2017

WEB OF SCIENCETM
Citations

6
Last Week
0
Last month
Citations as of Oct 17, 2017

Page view(s)

38
Last Week
2
Last month
Checked on Oct 15, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.