Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/5064
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estate-
dc.creatorChoi, TNY-
dc.creatorChan, DWM-
dc.creatorChan, APC-
dc.date.accessioned2014-12-11T08:24:29Z-
dc.date.available2014-12-11T08:24:29Z-
dc.identifier.issn0001-4575-
dc.identifier.urihttp://hdl.handle.net/10397/5064-
dc.language.isoenen_US
dc.publisherPergamon Pressen_US
dc.rightsNOTICE: this is the author’s version of a work that was accepted for publication in Accident analysis & prevention. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Accident analysis & prevention, vol. 48, (Sep 2012), DOI: 10.1016/j.aap.2011.04.015en_US
dc.subjectPay for SafetyScheme (PFSS)en_US
dc.subjectSafety performanceen_US
dc.subjectDifficultiesen_US
dc.subjectHong Kongen_US
dc.subjectConstruction industryen_US
dc.titlePotential difficulties in applying the Pay for Safety Scheme (PFSS) in construction projectsen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage145-
dc.identifier.epage155-
dc.identifier.volume48-
dc.identifier.doi10.1016/j.aap.2011.04.015-
dcterms.abstractSince 1996, the Government of the Hong Kong Special Administrative Region (HKSAR) has introduced the Pay for SafetyScheme (PFSS) to the public works construction contracts to uplift their safety performance. However, the adoption of PFSS has also encountered some difficulties that merit considerable attention. This paper purports to provide a concise review of the prevailing application of PFSS in Hong Kong in general, and to explore the potentialdifficulties associated with PFSS in particular. By means of an empirical questionnaire survey geared towards industrial practitioners with extensive direct hands-on PFSS experience, their opinions were solicited, analyzed and compared between the client group and contractor group of respondents. The three most significant difficulties in implementing PFSS were found to be: (1) “Plenty of paperwork required for certifying payment to contractor”; (2) “Complicated contract documents and lengthy assessment process”; and (3) “Over-tight project schedule requiring rush jobs”. The output of this research study is particularly essential in assisting the contracting parties to mitigate the avoidable hindrances when embarking on PFSS. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to PFSS success for future constructionprojects.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationAccident analysis and prevention, 2012, v. 48, p. 145-155-
dcterms.isPartOfAccident analysis and prevention-
dcterms.issued2012-09-
dc.identifier.isiWOS:000307140500018-
dc.identifier.scopus2-s2.0-84861843756-
dc.identifier.pmid22664678-
dc.identifier.rosgroupidr56993-
dc.description.ros2011-2012 > Academic research: refereed > Publication in refereed journal-
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
PolyU IR Submission 2012_AAP_1.pdfPre-published version233.16 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

208
Last Week
0
Last month
Citations as of Apr 14, 2024

Downloads

704
Citations as of Apr 14, 2024

SCOPUSTM   
Citations

21
Last Week
0
Last month
0
Citations as of Apr 5, 2024

WEB OF SCIENCETM
Citations

17
Last Week
0
Last month
0
Citations as of Apr 18, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.