Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/47632
Title: Minimizing setup time from mold-lifting crane in mold maintenance schedule
Authors: Wong, CS
Chan, FTS 
Chung, SH
Niu, B
Issue Date: 2013
Source: The Institute of Industrial Engineers Asian Conference 2013 (IIE Asian 2013 Conference), Taipei, Taiwan, 18-20 July 2013, p. 739-747 How to cite?
URI: http://hdl.handle.net/10397/47632
Appears in Collections:Conference Paper

Show full item record

Page view(s)

29
Last Week
1
Last month
Checked on Dec 11, 2017

Google ScholarTM

Check



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.