Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/34478
Title: Application of 4D for dynamic site layout and management of construction projects
Authors: Ma, Z
Shen, Q 
Zhang, J
Keywords: Site layout
3D model
4D CAD
Construction management
Issue Date: 2005
Publisher: Elsevier
Source: Automation in construction, 2005, v. 14, no. 3, p. 369-381 How to cite?
Journal: Automation in construction 
Abstract: Construction schedules and site space arrangement are essential to project management, as they directly influence security, machine running, material deployment, power distribution as well as construction progress and cost. There has been a strong need for more effective planning and management of site space and facilities. This paper introduces a 4D Integrated Site Planning System (4D-ISPS) which integrates schedules, 3D models, resources and site spaces together with 4D CAD technology to provide 4D graphical visualization capability for construction site planning. The features of 4D-ISPS are described in detail. The implementation techniques of this system are also discussed and a real life case is presented.
URI: http://hdl.handle.net/10397/34478
ISSN: 0926-5805
EISSN: 1872-7891
DOI: 10.1016/j.autcon.2004.08.011
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

50
Last Week
2
Last month
Citations as of Feb 26, 2017

WEB OF SCIENCETM
Citations

47
Last Week
0
Last month
Citations as of Aug 15, 2017

Page view(s)

40
Last Week
3
Last month
Checked on Aug 13, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.