Title: Resource-activity critical-path method for construction planning
Authors: Lu, M
Li, H 
Keywords: Construction planning
Critical path method
Project management
Resource management
Scheduling
Issue Date: 2003
Publisher: American Society of Civil Engineers
Source: Journal of construction engineering and management, 2003, v. 129, no. 4, p. 412-420 How to cite?
Journal: Journal of construction engineering and management 
Abstract: In this paper, a practical method is developed in an attempt to address the fundamental matters and limitations of existing methods for critical-path method (CPM) based resource scheduling, which are identified by reviewing the prior research in resource-constrained CPM scheduling and repetitive scheduling. The proposed method is called the resource-activity critical-path method (RACPM), in which (1) the dimension of resource in addition to activity and time is highlighted in project scheduling to seamlessly synchronize activity planning and resource planning; (2) the start/finish times and the floats are defined as resource-activity attributes based on the resource-technology combined precedence relationships; and (3) the "resource critical" issue that has long baffled the construction industry is clarified. The RACPM is applied to an example problem taken from the literature for illustrating the algorithm and comparing it with the existing method. A sample application of the proposed RACPM for planning a footbridge construction project is also given to demonstrate that practitioners can readily interpret and utilize a RACPM schedule by relating the RACPM to the classic CPM. The RACPM provides schedulers with a convenient vehicle for seamlessly integrating the technology/process perspective with the resource use perspective in construction planning. The effect on the project duration and activity floats of varied resource availability can be studied through running RACPM on different scenarios of resources. This potentially leads to an integrated scheduling and cost estimating process that will produce realistic schedules, estimates, and control budgets for construction.
URI: http://hdl.handle.net/10397/24944
ISSN: 0733-9364
EISSN: 1943-7862
DOI: 10.1061/(ASCE)0733-9364(2003)129:4(412)
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

49
Last Week
2
Last month
0
Citations as of Aug 15, 2018

WEB OF SCIENCETM
Citations

36
Last Week
0
Last month
1
Citations as of Aug 21, 2018

Page view(s)

76
Last Week
0
Last month
Citations as of Aug 19, 2018

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.