Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/2370
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estate-
dc.creatorChan, DWM-
dc.creatorChan, APC-
dc.creatorLam, TIP-
dc.creatorWong, JMW-
dc.date.accessioned2014-12-11T08:29:06Z-
dc.date.available2014-12-11T08:29:06Z-
dc.identifier.issn0733-9364-
dc.identifier.urihttp://hdl.handle.net/10397/2370-
dc.language.isoenen_US
dc.publisherAmerican Society of Civil Engineersen_US
dc.rightsJournal of Construction Engineering and Management © 2010 ASCE. The published version in ASCE's Engineering Database at: http://cedb.asce.org/cgi/WWWdisplay.cgi?262889en_US
dc.subjectGuaranteed maximum priceen_US
dc.subjectTarget cost contractingen_US
dc.subjectPitfallsen_US
dc.subjectRisksen_US
dc.subjectDifficultiesen_US
dc.subjectHong Kongen_US
dc.titleEmpirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in constructionen_US
dc.typeJournal/Magazine Articleen_US
dc.description.otherinformationAuthor name used in this publication: Patrick T. I. Lamen_US
dc.identifier.spage495-
dc.identifier.epage507-
dc.identifier.volume136-
dc.identifier.issue5-
dc.identifier.doi10.1061/(ASCE)CO.1943-7862.0000153-
dcterms.abstractOver the past few decades, both the guaranteed maximum price (GMP) and target cost contracting (TCC) arrangements have been regarded as alternative integrated procurement strategies for clients to mitigate risks, minimize claims, integrate the diverse interests of a complex construction project, and offer incentives to provide value-added services. However, the adoption of GMP/TCC contracts may also generate significant risks and difficulties that merit considerable attention. This paper aims to provide a concise review of the potential pitfalls of the GMP/TCC scheme in general and identifies the key risk factors and potential difficulties associated with GMP/TCC in comparison with other procurement strategies in construction in particular via an empirical survey of clients, contractors, and consultants in Hong Kong. The survey data gleaned from 45 valid replies were analyzed using the mean score ranking technique, Kendall's concordance test, and Spearman's rank correlation test. The survey results indicated that “involvement of inexperienced or claim-conscious contractors in a project procured by a GMP/TCC contract” was considered to be the most significant risk factor; while “design development must keep pace with main contractor's program for tendering the domestic subcontractors' works packages” as the major difficulty in implementing GMP/TCC projects. The research findings derived from this study are particularly essential in assisting the contracting parties to mitigate the detriments brought about by potential risks or difficulties when embarking on GMP/TCC contracts. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to GMP/TCC success for future construction projects.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationJournal of construction engineering and management, May 2010, v. 136, no. 5, p. 495-507-
dcterms.isPartOfJournal of construction engineering and management-
dcterms.issued2010-05-
dc.identifier.isiWOS:000276693000003-
dc.identifier.scopus2-s2.0-77951289847-
dc.identifier.eissn1943-7862-
dc.identifier.rosgroupidr47039-
dc.description.ros2009-2010 > Academic research: refereed > Publication in refereed journal-
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
PolyU IR Submission 2010_JCEM_2.pdfPre-published version460.16 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

163
Last Week
0
Last month
Citations as of Apr 21, 2024

Downloads

407
Citations as of Apr 21, 2024

SCOPUSTM   
Citations

27
Last Week
0
Last month
2
Citations as of Apr 19, 2024

WEB OF SCIENCETM
Citations

25
Last Week
0
Last month
1
Citations as of Apr 25, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.