Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/23131
Title: Modelling labour demand at project level - an empirical study in Hong Kong
Authors: Chan, APC 
Wong, JMW
Chiang, YH 
Issue Date: 2003
Publisher: Emerald Group Publishing Limited
Source: Journal of engineering, design and technology, 2003, v. 1, no. 2, p. 135-150 How to cite?
Journal: Journal of engineering, design and technology 
Abstract: The construction industry plays a significant role to the economy of Hong Kong not only in terms of output but also the employment. The sector, however, has been severely hit by the economic downturn in recent years resulting in serious unemployment. Employment planning becomes one of the critical aspects for the recovery of the economy. The main objective of this paper is to establish a labour demand model for the Hong Kong construction industry. The unique characteristics and the current conditions of the construction labour market are reviewed. Regression analysis based on 123 construction projects was used to compute the relationship between expenditure and site workers employed. The best predictor of average labour demand of construction projects in Hong Kong is found to be DL = 463 C 0.934 , where DL is the actual labour demand in man-days, C is the final cost of contract in millions. The labour demand-cost relationship can be applied as a manpower forecasting model to estimate the total labour required for a given type of project. The developed model enables a more reliable and accurate planning of manpower requirements in the construction industry.
URI: http://hdl.handle.net/10397/23131
ISSN: 1726-0531
EISSN: 1758-8901
DOI: 10.1108/eb060894
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page view(s)

41
Last Week
2
Last month
Checked on Aug 21, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.