Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/21464
Title: Determining the causal structure of rework influences in construction
Authors: Love, PED
Manual, P
Li, H 
Keywords: Causal loop diagramming
Quality management
Rework
System dynamics
Issue Date: 1999
Publisher: Routledge, Taylor & Francis Group
Source: Construction management and economics, 1999, v. 17, no. 4, p. 505-517 How to cite?
Journal: Construction management and economics 
Abstract: One of the most perplexing issues facing organizations in the construction industry is their inability to become quality focused. As a result sub-standard products and services often emanate, which inadvertently result in rework. Typically, rework is caused by errors made during the design process. These errors appear downstream in the procurement process and therefore have a negative impact on a project's performance. The lack of attention to quality, especially during the design process, has meant that rework has become an inevitable feature of the procurement process, and the costs have been found to be as high as 12.4% of total project costs. Such costs could be even higher because they do not represent schedule delays, litigation costs and other intangible costs of poor quality. To reduce the cost and effect of rework, an understanding of its causal structure is needed so that effective prevention strategies can be identified and the effects of rework reduced or eliminated. A case study approach based upon deductive and inductive reasoning is used to identify the major factors that influence rework in projects. From the findings and with reference to recent literature, the concept of system dynamics is used to develop a series of influence diagrams, which are then integrated to develop a conceptual causal loop model that is used to determine the overall causal structure of rework. Once an understanding of the causal structure of rework events has been acquired, effective strategies for rework prevention can be designed and implemented in order to improve project performance. This paper contributes to study of quality in construction by capturing the complexity and dynamism of those factors that influence rework and project performance in a holistic manner.
URI: http://hdl.handle.net/10397/21464
ISSN: 0144-6193
EISSN: 1466-433X
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

116
Last Week
0
Last month
1
Citations as of Nov 13, 2018

Page view(s)

93
Last Week
0
Last month
Citations as of Nov 12, 2018

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.