Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/21208
Title: Large-scale Ultra High Voltage Alternate/direct current hydropower absorption problems
Authors: Cheng, CT
Shen, JJ
Cheng, X
Chau, KW 
Keywords: Hydropower
Large power grid
Peak shaving
Power transmissionfrom West to East
Ultra High Voltage Direct Current
Issue Date: 2015
Publisher: American Society of Civil Engineers (ASCE)
Source: World Environmental and Water Resources Congress 2015: Floods, Droughts, and Ecosystems - Proceedings of the 2015 World Environmental and Water Resources Congress, 2015, p. 1904-1914 How to cite?
Abstract: With huge hydropower plants, such as Xiluodu, Xiangjiba, Nuozhadu and Jingping located in the watershed of Jinshajiang, Yalongjiang and Lancangjiang being completed and put into commission, hydropower transmission capacity in China is expanded rapidly. Large-scale hydropower transmission has a direct impact on the rational allocation of electricity resources in national scale, especially on the compromise between absorbing hydropower for sending end power grids and shaving peak load for receiving end power grids. However, owing to the limited regulation and absorption capacity of sending end hydropower plants, existing transmission schedules of hydropower in China are based on own operating requirements or surplus electricity of the sending end power grids. Thus it is vulnerable to "straight line" or "opposite peak shaving" transmission schedules which in turn aggravate pressure to peak shaving load in receiving end power grids. This is in opposite to the absorption and quality peak regulation capability of large-scale hydropower. A new challenge for the coordinating operations is how to utilize load peak and valley difference and the characteristics of different power sources to absorb surplus hydropower from supplying power grids and to shave peak load for receiving power grids, so as to exhibit the complementary roles of inter-basin cascade hydropower stations. The problem involves optimization scheduling methods, compensation mechanism, peak thresholds and coordination strategy among regional power grids, province power grids and plants. The key of the problem is to solve the existing large-scale Ultra High Voltage Alternate Current (UHVAC)/Ultra High Voltage Direct Current (UHVDC) hydropower absorption in China. The purposes are to allocate power resources more rationally, alleviate the pressure of the receiving end power grid from peak shaving, improve the power source structures of Yangtze Delta and Pearl River Delta, reduce the haze pressure in these areas, and effectively safeguard the safety, economy and environmental protection, reliable operation of power grids in China.
Description: World Environmental and Water Resources Congress 2015: Floods, Droughts, and Ecosystems, 17-21 May 2015
URI: http://hdl.handle.net/10397/21208
ISBN: 9780784479162
DOI: 10.1061/9780784479162.186
Appears in Collections:Conference Paper

Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page view(s)

45
Last Week
0
Last month
Checked on Sep 25, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.