Title: Failure caused by inappropriate construction methods : an expensive lesson
Authors: Ren, Z
Shen, GQ 
Xue, XL
Keywords: Construction method
Drainage
Improvement
Project failure
Selection
Technical management
Issue Date: 2013
Publisher: American Society of Civil Engineers
Source: Journal of management in engineering, 2013, v. 29, no. 1, p. 25-34 How to cite?
Journal: Journal of management in engineering 
Abstract: Construction method selection, implementation, and improvement (CMSII) is a crucial and difficult task for construction projects, especially for large and complex projects, which often face constraints such as complex project environment, lack of information, and uncertainties caused by new technologies. Despite its importance, few research projects have been conducted in this field, especially from both technical and management points of view. Although cases of project failure caused by inappropriate construction methods are reported from time to time, studies of the detailed causes and lessons learned are rare. This research developed a CMSII workflow model and discussed the CMSII process in a drainage project that suffered multimillion-dollar losses due to problems associated with CMSII. By investigating the details of the CMSII, this study identifies the key technical and management issues to be considered in each CMSII stage, reveals the problems, and, most importantly, summarizes the lessons learned.
URI: http://hdl.handle.net/10397/21032
ISSN: 0742-597X
EISSN: 1943-5479
DOI: 10.1061/(ASCE)ME.1943-5479.0000117
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.