Title: Optimizing construction planning and scheduling through combined virtual prototyping technology and building information models
Authors: Chan, N
Li, H 
Keywords: Building information models
Construction planning and schedule
Virtual prototyping
Issue Date: 2009
Source: VTT Symposium (Valtion Teknillinen Tutkimuskeskus), 2009, no. 259, p. 320-332 How to cite?
Abstract: As the design of building has become more complex nowadays, it is very difficult for project managers to compute the time of construction planning and scheduling accurately. There is a pressing need of high level computer-assisted technologies to develop a comprehensive construction planning and schedule before a project is actually built. Currently, these computer-assisted technologies are often limited to the function for the examination of constructability or so. This paper introduces the use of combined virtual prototyping (VP) technology with Building Information Models (BIMs) to optimize the construction planning and scheduling. A real-life case study is adopted in the paper to show how the VP technology and the BIMs are used to conduct construction planning and scheduling, particularly focusing on arranging tower cranes to achieve the construction floor cycle.
Description: 1st International Conference on Improving Construction and Use through Integrated Design Solutions, CIB IDS 2009, Espoo, 10-12 June 2009
URI: http://hdl.handle.net/10397/19777
ISBN: 9789513863418
ISSN: 0357-9387
Appears in Collections:Conference Paper

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

1
Citations as of Sep 16, 2017

WEB OF SCIENCETM
Citations

1
Last Week
0
Last month
0
Citations as of Sep 15, 2017

Page view(s)

39
Last Week
1
Last month
Checked on Sep 17, 2017

Google ScholarTM

Check



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.