Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/19122
Title: Group scheduling with independent setup times, ready times, and deteriorating job processing times
Authors: Wang, JB
Huang, X
Wu, YB
Ji, P 
Keywords: Deteriorating jobs
Group technology
Ready time
Scheduling
Single machine
Issue Date: 2012
Publisher: Springer
Source: International journal of advanced manufacturing technology, 2012, v. 60, no. 5-8, p. 643-649 How to cite?
Journal: International journal of advanced manufacturing technology 
Abstract: In this paper we investigate a single machine scheduling problem with deteriorating jobs and group technology assumption. By deteriorating jobs and group technology assumption, we mean that job processing times are simple linear functions of its starting times. The group setup times are assumed to be known and fixed. We attempt to minimize the makespan with ready times of the jobs. For a special case, we show that the problem can be solved in polynomial time when deterioration and group technology are considered simultaneously.
URI: http://hdl.handle.net/10397/19122
ISSN: 0268-3768
EISSN: 1433-3015
DOI: 10.1007/s00170-011-3639-1
Appears in Collections:Conference Paper

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

29
Last Week
0
Last month
1
Citations as of Sep 24, 2017

WEB OF SCIENCETM
Citations

27
Last Week
1
Last month
1
Citations as of Sep 21, 2017

Page view(s)

35
Last Week
5
Last month
Checked on Sep 24, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.