Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/15840
Title: Outage planning of electrical power system networks using genetic algorithm
Authors: Chan, FTS 
Lau, HCW
Ko, CC
Keywords: Algorithms
Electricity industry
Maintenance
Planning
Issue Date: 2000
Source: Journal of quality in maintenance engineering, 2000, v. 6, no. 4, p. 241-259 How to cite?
Journal: Journal of Quality in Maintenance Engineering 
Abstract: An electrical company is responsible for the maintenance of a transmission network of high voltage electricity. The maintenance schedule must be planned so as to minimize outage costs, taking into consideration various factors such as system security/reliability, system availability, and manpower utilization. With the rapid growth of organization, planning engineers are required to fulfill additional roles in order to increase productivity. To this end, a fast response and accurate mechanism is required to assist the planning engineers in dealing with the daily operation. This paper describes how a proposed maintenance schedule can be obtained automatically by the adoption of genetic algorithm. The main aim is to determine the maintenance schedule of circuit outage with minimizing the maintenance cost and maximizing the circuit availability under certain unavoidable system constraints. Further, an additional search mechanism called "final tuning search" is developed to enhance the system performance.
URI: http://hdl.handle.net/10397/15840
ISSN: 1355-2511
DOI: 10.1108/13552510010346752
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page view(s)

33
Last Week
3
Last month
Checked on Aug 20, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.