Title: The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes
Authors: Li, H 
Chan, NKY
Skitmore, M
Keywords: Construction operations
Construction planning
Cranes
Mobile cranes
Project planning
Sequencing
Simulation
Virtual prototyping
Issue Date: 2012
Publisher: Emerald Group Publishing Limited
Source: Construction innovation, 2012, v. 12, no. 4, p. 429-446 How to cite?
Journal: Construction innovation 
Abstract: Purpose - Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach - The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings - Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications - The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value - This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.
URI: http://hdl.handle.net/10397/15085
ISSN: 1471-4175
EISSN: 1477-0857
DOI: 10.1108/14714171211272207
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

3
Last Week
0
Last month
0
Citations as of Oct 7, 2017

Page view(s)

41
Last Week
1
Last month
Checked on Oct 16, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.