Title: Fire services installation related contributors of construction delays
Authors: Fong, NK 
Wong, LY
Wong, LT 
Keywords: Construction delay
Consulting engineers
Contributors
Fire services contractors
Issue Date: 2006
Publisher: Pergamon Press
Source: Building and environment, 2006, v. 41, no. 2, p. 211-222 How to cite?
Journal: Building and environment 
Abstract: Delay is a common problem in the construction industry and there are several reasons that can contribute to delaying a project. In Hong Kong, completion of fire services installation is prerequisite to completing/ finishing a building construction work. The fire services installation must be completed for application of an occupation permit for a building. Fail to obtain the permit on time would lead to construction delay. Apparently, fire services contractors play an important role in obtaining the occupation permit for a project completion. The economic losses due to construction delay could be very significant. This research identified, from a list of 49 pre-determined factors in nine categories (shown in Appendix A), the principal factors contributed to construction delays in a fire services installation. In particular, a questionnaire survey of 52 fire services contractors and 32 consulting engineers was conducted in order to obtain their professional judgements about the relative importance of the contributors of construction delay related to the fire services installation. The result showed that the principal contributors were: (1) improper site co-ordination and management of the electrical and mechanical installations, (2) lack of timely decision making of the client, and (3) defects identified during the fire services inspection by local authorities. In addition differing views were found between the consulting engineers and contractors on the areas identified were: (1) site management and supervision, (2) workload of the project staff, (3) the procedures for equipment approval, and (4) working experience of the parties. A monitoring and quality assurance system would be required in these areas to minimize the risk of the probable construction delay.
URI: http://hdl.handle.net/10397/11562
ISSN: 0360-1323
DOI: 10.1016/j.buildenv.2005.01.004
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

10
Last Week
0
Last month
0
Citations as of May 21, 2017

WEB OF SCIENCETM
Citations

2
Last Week
0
Last month
0
Citations as of May 20, 2017

Page view(s)

43
Last Week
1
Last month
Checked on May 21, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.