Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/11454
Title: Cost model for deferred state life test plans with replacement
Authors: Cheng, TCE 
Lau, MSD
Issue Date: 1995
Publisher: Taylor & Francis
Source: Production planning and control, 1995, v. 6, no. 6, p. 555-563 How to cite?
Journal: Production planning and control 
Abstract: A cost model is presented for the deferred state life test plan, a sampling plan which uses information about subsequent lots for making decisions to accept or reject the current lot. The total test cost of using the deferred state life test plan is evaluated to see if using the method can reduce the total cost of the sampling test. A cost comparison is also made between a deferred state life test plan and a comparable military standard sampling plan which offers the same level of producer's and consumer's protection.
URI: http://hdl.handle.net/10397/11454
ISSN: 0953-7287
EISSN: 1366-5871
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page view(s)

52
Last Week
2
Last month
Checked on Aug 13, 2017

Google ScholarTM

Check



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.