Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/10107
Title: Multiple workshift options in aggregrate production planning models
Authors: Troutt, MD
Hou, SH
Pang, WK
Keywords: Production planning and scheduling
Capacity planning
Labor and staff scheduling
Enterprise resources planning
Mixed integer programming applications
Issue Date: 2006
Publisher: American Institute of Mathematical Sciences
Source: Journal of industrial and management optimization, 2006, v. 2, no. 4, p. 387-398 How to cite?
Journal: Journal of industrial and management optimization 
Abstract: Second and third shift considerations are important for production planning and scheduling in most manufacturing facilities. A careful literature survey revealed that multiple workshift considerations have not been previously discussed for general aggregate production planning models. In this paper, we propose a mixed integer logic for permitting the opening or closing of second and third shifts of production within a generic model having linear and quadratic cost components. We illustrate the results of the model on a hypothetical data sets. The model permits different costs for opening and closing the extra shifts and provides for a minimum required work force size for the extra shifts.
URI: http://hdl.handle.net/10397/10107
ISSN: 1547-5816
EISSN: 1553-166X
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

WEB OF SCIENCETM
Citations

2
Last Week
0
Last month
0
Citations as of Nov 18, 2017

Page view(s)

37
Last Week
1
Last month
Checked on Nov 13, 2017

Google ScholarTM

Check



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.