Browsing by Keyword Scheduling

Jump to a point in the index:
Showing results 1 to 80 of 247  next >
DateTitleAuthor(s)
1993Optimal scheduling in film production to minimize talent hold costCheng, TCE ; Diamond, JE; Lin, BMT
1993A note on one-processor scheduling with asymmetric earliness and tardiness penaltiesLi, CL ; Chen, ZL; Cheng, TCE 
1994Optimal assignment of due-dates for preemptive single-machine schedulingCheng, TCE ; Gordon, VS
1996Batch scheduling and common due-date assignment on a single machineCheng, TCE ; Kovalyov, MY
1996Single-machine scheduling with trade-off between number of tardy jobs and resource allocationCheng, TCE ; Chen, ZL; Li, CL 
1998An exact algorithm for batching and scheduling two part types in a mixed shop: A technical noteCheng, TCE ; Kovalyov, MY
1998The complexity of single machine scheduling with two distinct deadlines and identical decreasing rates of processing timesCheng, TCE ; Ding, Q
1998Multi-machine scheduling with variance minimizationCai, X; Cheng, TCE 
1998The complexity of scheduling starting time dependent tasks with release timesCheng, TCE ; Ding, Q
1998Scheduling to minimize the total compression and late costsCheng, TCE ; Chen, ZL; Li, CL; Lin, BMT
1999Single-machine scheduling with controllable processing times and earliness, tardiness and completion time penaltiesBiskup, D; Cheng, TCE 
1999Multiple-machine scheduling with earliness, tardiness and completion time penaltiesBiskup, D; Cheng, TCE 
1999The time dependent machine makespan problem is strongly NP-completeCheng, TCE ; Ding, Q
2000Single Machine Scheduling with Learning Effect ConsiderationsCheng, TCE ; Wang, G
2000Solvable cases of permutation flowshop scheduling with dominating machinesXiang, S; Tang, G; Cheng, TCE 
2000Co-ordination of transformer tap and capacitor operation for reactive power voltage control in a distribution primary substationWong, TK; Mak, CM; Chung, TS
2001Single machine batch scheduling with resource dependent setup and processing timesCheng, TCE ; Janiak, A; Kovalyov, MY
2001Single Supplier Scheduling for Multiple DeliveriesCheng, TCE ; Kovalyov, MY
2001Single machine scheduling with step-deteriorating processing timesCheng, TCE ; Ding, Q
2001Heuristics for two-machine no-wait flowshop scheduling with an availability constraintWang, G; Cheng, TCE 
2002Scheduling start time dependent jobs to minimize the total weighted completion timeBachman, A; Cheng, TCE ; Janiak, A; Ng, CT 
2002Strong NP-hardness of the single machine multi-operation jobs total completion time scheduling problemNg, CT ; Cheng, TCE ; Yuan, JJ
2002Scheduling with job release dates, delivery times and preemption penaltiesLiu, Z; Cheng, TC 
2002An unconstrained optimization problem is NP-hard given an oracle representation of its objective function : a technical noteCheng, TCE ; Kovalyov, MY
2002A note on the single machine serial batching scheduling problem to minimize maximum lateness with precedence constraintsNg, CT ; Cheng, TCE ; Yuan, JJ
2002The state of the art in simulation study on FMS scheduling : a comprehensive surveyChan, FTS ; Chan, HK; Lau, HCW
2003On the single machine serial batching scheduling problem to minimize total completion time with precedence constraints, release dates and identical processing timesNg, CT ; Cheng, TCE ; Yuan, JJ; Liu, ZH
2003Resource-activity critical-path method for construction planningLu, M; Li, H 
2003A stronger complexity result for the single machine multi-operation jobs scheduling problem to minimize the number of tardy jobsCheng, TCE ; Ng, CT ; Yuan, JJ
2003Single machine scheduling with release dates and due datesTian, Zhongjun
2003Concurrent open shop scheduling to minimize the weighted number of tardy jobsNg, CT ; Cheng, TCE ; Yuan, JJ
2003Batch scheduling with controllable setup and processing times to minimize total completion timeNg, CTD ; Cheng, TCE ; Kovalyov, MY
2003Scheduling a single server in a two-machine flow shopCheng, TCE ; Kovalyov, MY
2003Single machine scheduling of unit-time jobs with controllable release datesCheng, TCE ; Shakhlevich, NV
Jan-2003On scheduling an unbounded batch machineLiu, Z; Yuan, JJ; Cheng, TCE 
Jul-2003Approximability of two-machine no-wait flowshop scheduling with availability constraintsCheng, TCE ; Liu, Z
Sep-2003The single machine batching problem with family setup times to minimize maximum lateness is strongly NP-hardCheng, TCE ; Ng, CTD ; Yuan, JJ
30-Nov-2003[3/2]-approximation for two-machine no-wait flowshop scheduling with availability constraintsCheng, TCE ; Liu, Z
2004A prioritized fuzzy constraint satisfaction approach to model agent negotiation for railway schedulingTsang, CW; Ho, TK
2004Single machine batch scheduling with jointly compressible setup and processing timesNg, DCT ; Cheng, TCE ; Kovalyov, MY
2004A concise survey of scheduling with time-dependent processing timesCheng, TCE ; Ding, Q; Lin, BMT
2004Complexity results for flow-shop and open-shop scheduling problems with transportation delaysBrucker, P; Knust, S; Cheng, TCE ; Shakhlevich, NV
2004Hybrid flow-shop scheduling problems with multiprocessor task systemsOguz, C; Zinder, Y; Do, VH; Janiak, A; Lichtenstein, M
2004Deterministic and stochastic scheduling with teamwork tasksCai, X; Zhou, X
2004An adaptive sliding mode controller for buck converter in continuous conduction modeTan, SC; Lai, YM ; Tse, CKM ; Cheung, MKH
2004Single machine parallel batch scheduling subject to precedence constraintsCheng, TCE ; Ng, CT ; Yuan, JJ; Liu, ZH
Jan-2004Batching in a two-stage flowshop with dedicated machines in the second stageCheng, TCE ; Kovalyov, MY; Chakhlevich, KN
14-Jun-2004The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespanYuan, JJ; Liu, Z; Ng, CTD ; Cheng, TCE 
16-Oct-2004A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing timesYuan, JJ; Yang, AF; Cheng, TCE 
2005Minimizing completion time variance with compressible processing timesNg, CT ; Cai, X; Cheng, TCE ; Lam, SS
2005Machine scheduling with pickup and deliveryLi, CL ; Ou, J
2005High-level synthesis for DSP applications using heterogeneous functional unitsShao, Z; Zhuge, Q; Xue, C; Xiao, B ; Sha, E
2005On the single machine total tardiness problemTian, ZJ; Ng, CT ; Cheng, TCE 
2005Single machine scheduling with a restricted rate-modifying activityHe, Y; Ji, M; Cheng, TCE 
Apr-2005Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing timesCheng, TCE ; Yuan, JJ; Yang, AF
May-2005Single machine scheduling with resource dependent release times and processing timesWang, X; Cheng, TCE 
1-Jul-2005Machine scheduling with deliveries to multiple customer locationsLi, CL ; Vairaktarakis, G; Lee, CY
Aug-20054D dynamic construction management and visualization software : 2. site trialChau, KW ; Anson, M; De Saram, DD
Aug-20054D dynamic construction management and visualization software : 1. DevelopmentChau, KW ; Anson, M; Zhang, JP
1-Sep-2005Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problemCheng, TCE ; Shakhlevich, NV
30-Nov-2005Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machineLiu, Z; Cheng, TCE 
2006Algorithms and analysis of scheduling for loops with minimum switchingShao, Z ; Zhuge, Q; Liu, M; Xue, C; Sha, EHM; Xiao, B 
2006Achieving bounded delay on message delivery in publish/subscribe systemsWang, J; Cao, J ; Li, J; Wu, J
2006Minimizing total completion time in a two-machine flow shop with deteriorating jobsWang, JB; Ng, CTD ; Cheng, TCE ; Liu, LL
2006Scheduling with controllable release dates and processing times: Total completion time minimizationCheng, TCE ; Kovalyov, MY; Shakhlevich, NV
2006Single machine batch scheduling problem with family setup times and release dates to minimize makespanYuan, JJ; Liu, Z; Ng, CTD ; Cheng, TCE 
2006Heuristic scheduling of resource-constrained, multiple-mode and repetitive projectsZhang, H; Li, H ; Tam, CM
2006Scheduling with controllable release dates and processing times : Makespan minimizationCheng, TCE ; Kovalyov, MY; Shakhlevich, NV
2006Optimizing address assignment and scheduling for DSPs with multiple functional unitsXue, C; Shao, Z ; Zhuge, Q; Xiao, B ; Liu, M; Sha, EHM
2006Permutation-based particle swarm optimization for resource-constrained project schedulingZhang, H; Li, H ; Tam, CM
2006Cross-Layer enhanced real-time packet scheduling over CDMA networksChen, H; Chan, HCB ; Leung, VCM
2006Particle swarm optimization for preemptive scheduling under break and resource-constraintsZhang, H; Li, H ; Tam, CM
Jan-2006Scheduling with step-improving processing timesCheng, TCE ; He, Y; Hoogeveen, H; Ji, M; Woeginger, GJ
Oct-2006Scheduling linear deteriorating jobs with an availability constraint on a single machineJi, M; He, Y; Cheng, TCE 
11-Oct-2006Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobsCheng, TCE ; Ng, CTD ; Yuan, JJ
16-Oct-2006Scheduling unit-length jobs with machine eligibility restrictionsLi, CL 
2007A mixed integer programming model for advanced planning and scheduling (APS)Chen, K; Ji, P 
2007Single machine serial-batching scheduling problem with a common batch size to minimize total weighted completion timeYuan, JJ; Lin, YX; Cheng, TCE ; Ng, CT 
2007Real-time dynamic voltage loop scheduling for multi-core embedded systemsShao, Z ; Wang, M; Chen, Y; Xue, C; Qiu, M; Yang, LT; Sha, EH
2007Coordinated workload scheduling in hierarchical sensor networks for data fusion applicationsLi, X; Kang, H; Cao, J